Dear sir,
We CHEC as the contractor of the GPHA, now we are finding subcontractors to do the necessary work on site for the project Dredging of the port of Tema. The specifications and requirements are as follow :
1.Scope of Service: Clearance and salvage service
2.Service Location:Project dredging area
3.Project Introduction:The project Dredging of the port of Tema between GPH
4.Service Requirements: Clearance and salvage of underwater obstructions within the dredging area
5.Service Period : 4 months, form 1th December 2025 to 31h March 2026
6.Requirements for equipment and manpower : Underwater Survey, Exploration, and Salvage Equipment
7.Payment
7.1 Advance payment:The advance payment shall be equivalent to twenty percent (20%) of the Accepted Contract Amount, excluding VAT
7.2 Progress payment:Both parties shall conduct monthly confirmations. Our company will make payment within 30 days of receiving the employer's progress payment.
7.3 Advance payment deduction:Minimum of 15% of each Interim Payment Certificate (IPC) or a Maximum of 20% of the total Advance Payment, whichever is the lesser to be deducted from the net IPC amount due under each interim payment certificate until full covey.
7.4 Reserve fund:5% of the value of works executed until the total amount retained reaches a maximum limit of 2.5% of the Accepted Contract Amount.
8.Performance Guarantee:10% of the Contract Amount
9.Others:
9.1 You shall be solely responsible for obtaining the relevant permits.
9.2 During the term of the subcontract agreement, the price agreed upon by both parties shall not be adjusted.
10.Quotation List
| No |
Required Resources |
Work Description |
Unit |
Quantity |
Unit price |
Total |
| 1 |
Divers,Diving equipment |
Conduct underwater surveys of the construction area and salvage any obstructions. |
ten thousand square meters |
70.87 |
Notes:
(1) Quotations must specify the currency. This quotation excludes taxes and fees. Invoices will be issued in the form of formal invoices.
(2) The quotation must include all labor costs, material costs, vessel machinery usage fees, management fees, safety measures fees, and all related expenses.
(3)Please clearly specify unit prices,total prices, and a detailed breakdown of cost components. Indicate the quotation validity period (recommended to be no less than 30 days).
(4)Quotation deadline time limit:21th November 2025.
(5)Quotation Method:Email with the sign and stamped quotation in the attachment.
(6)Please also provide all the company's business license and other relevant certificates.
Please kindly check the above requirements and specifications, if any matters please see the follow contact information:
Contact Person:Jia Jing Yu
Contact Number:0543365297
Email address:dredgingoftheportoftema@gmail.com
Contact Address:GT-136-4534 Tema Community 3 Site A First street, Tema, Ghana We look forward to your prompt reply.
Yours faithfully
本公告详情仅供VIP会员或SVIP会员查阅,您当前权限无法查看完整内容,请先 登录 或 注册 ,办理会员入网事宜后按照后续流程参与投标!
联系人:张晟
手 机:13621182864
邮 箱:zhangsheng@zgdlyzc.com